Neptune Seagull Project (Technip)
Since late 2019 Bureau Technical Services has been supported this project in Norway with Coating vendor surveillance activities (Production application & performance testing in-line with inspection and test plans)
The Seagull field will be developed with up to four subsea wells drilled from a new four-slot manifold 17 km south of the BP-operated ETAP Central Processing Facility (CPF). Production will be delivered via a new 5 km subsea pipeline, which will tie the Seagull manifold to the existing Heron pipeline system via a newly installed tie-in skid at the Egret manifold. Production will then utilise the Heron pipeline system and riser to evacuate fluids to the ETAP CPF. The planned development will require installation of a new 17 km control umbilical direct from ETAP.